Myers Illuminator CIII-H OSHPD Rated Three Phase Lighting Inverter
Myers EPS offers a full line of three phase OSHPD rated emergency lighting inverters that provide up to 50kVA/kW of backup power for larger facilities and campuses.
Capacity and Dimensions
4.8kVA/kW — 8.0 kVA/kW
1 Inverter Cabinet & 1 Battery Cabinet – Total System Dimensions: 47″ H x 66.3″ W x 25″ D
10.0kVA/kW — 16.7kVA/kW
1 Inverter Cabinet & 2 Battery Cabinets – Total System Dimensions: 47″ H x 96.19″ W x 25″ D
24kVA/kW
1 Inverter Cabinet & 1 Battery Cabinet – Total System Dimensions: : 72″ H x 99″ W x 31″ D
33kVA/kW — 50kVA/kW
1 Inverter Cabinet & 2 Battery Cabinets – Total System Dimensions: : 72″ H x 147″ W x 31″ D
Standard Features
Three Phase, Pure Sine Wave
120V/208V or 277V/480V
UL 924 Self-Testing and Diagnostics via Front Meter Panel
Internal Maintenance Bypass Switch
Front Access, Maintenance-Free VRLA batteries
Supports All Lamp Sources
Warranty:
Electronics – 1 Year Standard Includes All Parts
Batteries – 1 Year Full, 9 Years Prorated
Optional Features
Enhanced Communications
New IoT Inverter Connect Cloud Software
Expanded Building Management Protocols
Output Circuit Breakers (10 A — 63 A)
Normally Off Output
20 Year Battery Warranty (1 Year Full; 19 Year Pro-Rated)
Output Trip Alarm
Status Monitoring Contacts
Form C Contacts
Specifications:
Input 120/208 or 277/480 VAC 3 Phase 4 Wire Wye Configuration
Output 120/208 or 277/480 VAC 3 Phase Wye Or Delta Configuration
Output Load Power Factor .5 Lag to .5 Lead
LED, Electronic & Magnetic Ballast Compatible
Output Distortion Less Than 3% THD For Linear Loads
Forced Air Cooling Only During Emergency Operation; No Filters Required Generator Compatibility
90 Minute Runtime Standard; Additional Runtimes Available Upon Request
Sizes
4.8kVA, 6kVA, 8kVA, 10kVA, 12.5kVA, 16.7kVA, 24kVA, 33kVA, 40kVA & 50kVA
Recent News
Spring Facility Check: Don’t Forget Your Lighting Inverter
As winter begins to fade and facilities start their spring maintenance routines, many teams focus on HVAC systems, generators, and electrical inspections. While these...
AI Is Changing Power Demands: Is Your UPS Infrastructure Ready?
{"height":13,"color":{"hue":213,"brightness":0.83,"saturation":1,"alpha":0},"hidden":false,"locked":false,"blockName":"Spacer"} Artificial intelligence isn’t just impacting hyperscale data centers. It’s changing power infrastructure requirements across mid-sized data centers, healthcare facilities, manufacturing plants, and enterprise IT...
The Real Difference Between Entry-Level, Mid-Range, and Enterprise UPS Systems
Choosing the right Uninterruptible Power Supply (UPS) isn’t just about size or price, it’s about matching the right level of protection to your...