N1 Critical N1C.L1000 1000VA/900W 120V Lithium Ion Rack/Tower UPS

$1,924.90

Only 2 left in stock

Adding to Cart Added to Cart
N1 Critical N1C.L1000 1000VA/900W 120V Lithium Ion Rack/Tower UPS

Specifications N1C.L1000:

INPUT

  • Voltage (Vac): 110/120
  • Frequency (Hz): 50/60±5% (±10% is selectable)
  • Power Factor: 0.9

OUTPUT

  • Capacity (VA/W): 1000/900
  • Voltage (Vac): 110/120±2%
  • Frequency (Hz): 50/60±2% (battery mode)
  • Waveform: Sine wave, THD<3% at linear load
  • Transfer time: 0ms
  • Overload: 105%~129% for 60 seconds, 130%~150% for 30 seconds, above 150% for 300ms
  • Input connection: 5-15P
  • NEMA Outlets: (8) 5-15R

BATTERY

  • Voltage (Vdc): 25.6
  • Run Time at 100%/50% Load (minutes): 13/26.5
  • Charger Current (A) mac: 4A, battery monitoring system included

OTHER:

  • Communications Interface: USB, EPO and SNMP/Network Card
  • Topology: Online Double Conversion
  • Alarm: Low battery, abnormal AC input, UPS failure
  • Protection: Low Battery, overload, short-circuit, over temperature
  • Working Temperature: 32º-140º
  • Relative Humidity: 0~95%, no condensation
  • Dimensions (HxWxD) (in): 3.4″(2U)x17.2″x16.8″
  • Net Weight (lb): 29

Recent News

Single-Phase vs. Three-Phase UPS: What Growing Businesses Get Wrong

Single-Phase vs. Three-Phase UPS: What Growing Businesses Get Wrong

As businesses grow, so do their power demands. What once worked for a small server room or office network can quickly become inadequate as more...

Read more
How Heat Affects Data Centers and Why Your UPS System Is at Risk

How Heat Affects Data Centers and Why Your UPS System Is at Risk

As temperatures rise and computing demands continue to grow, heat has become one of the most serious threats facing modern data centers, server rooms, and...

Read more
Spring Facility Check: Don’t Forget Your Lighting Inverter

Spring Facility Check: Don’t Forget Your Lighting Inverter

  As winter begins to fade and facilities start their spring maintenance routines, many teams focus on HVAC systems, generators, and electrical inspections. While these...

Read more