



Xtreme Power Conversion P80 800VA / 720W 120V Line Interactive Rack/Tower UPS
NEW (Open Box)
Xtreme Power Conversion P80 800VA / 720W 120V Line Interactive Rack/Tower UPS
The P80 is a pure sine wave line interactive UPS that protects critical data and equipment from power problems while supplying clean and reliable network grade power.
P80 units are the highest efficiency available, providing utility cost savings at all load levels. P80 design provides flexible mounting including tower, rack, or optional wall mounting.
P80 unity and 0.90 Power Factor models provide more power for high density loads.
Product Snapshot
- Available models: P80-800, 1100, 1500, 2000, 2200, 3000(V2)
- Pure sine wave output
- Tower, wall, 2-post and 4-post rack mounting configurations available
- Extended battery runtimes with optional matching battery modules
- UL, cUL, RoHS
- 3 years electronics, 3 years battery warranty (USA and Canada)
Specifications:
- 800VA / 720W pure sine wave power for reliable backup
- 120V input/output with selectable 110/115/127V settings
- Wide input range (–32% to +27%) protects against power fluctuations
- Fast transfer time: just 2–6 ms for seamless switchover
- High efficiency: up to 99% in ECO mode
- Clean power with low harmonic distortion (≤2–5%)
- Hot-swappable batteries (2 × 12V, 7Ah) recharge to 90% in ~4 hours
- Runtime: up to 29 minutes at 25% load, 4 minutes at full load
Recent News
Single-Phase vs. Three-Phase UPS: What Growing Businesses Get Wrong
As businesses grow, so do their power demands. What once worked for a small server room or office network can quickly become inadequate as more...
How Heat Affects Data Centers and Why Your UPS System Is at Risk
As temperatures rise and computing demands continue to grow, heat has become one of the most serious threats facing modern data centers, server rooms, and...
Spring Facility Check: Don’t Forget Your Lighting Inverter
As winter begins to fade and facilities start their spring maintenance routines, many teams focus on HVAC systems, generators, and electrical inspections. While these...